October 2024
Contractors install newly engineered, energy-efficient, double-pane replacement windows in Room 221 (Dr. Michael Brescia's office) and 311A (Laboratory of Zooarchaeology). The modern replacements greatly reduce thermal gain and filter out harmful UV light. Once all the window glass is replaced, the overall preservation environment throughout the entire building will be significantly improved.
Click on either the right or left side if each image to advance the slide show.
August 2024
Contractors from Sundt Construction begin localized demolition and abatement work on two windows in the north building: Room 221 (Dr. Michael Brescia's office) and 311A (Laboratory of Zooarchaeology). The goal is to figure out the best way to manufacture and install double-glazed replacements for the entire building.
Click on either the right or left side if each image to advance the slide show.
August 2024
In order to get a handle on the existing ductwork, crews begin cutting investigative holes in the walls and ceilings of corridors, bathrooms, and office spaces.
Click on either the right or left side if each image to advance the slide show.